Sponsored Content
Alpine Completes First Singapore Subway Tunnel
Sponsored Content
The Austrian construction company is building six subway tunnels and three subway stations for the Singapore Downtown Line.

The Austrian Alpine Construction Company completed the first of six subway tunnels for the Downtown Line in the center of Singapore, a city with a population of five million. ALPINE’s tunnel drill recently achieved a performance of 93 meters per week drilling a tube with a diameter of 6.6 meters through the underground between the “Tan Kah Dee” and “Sixth Avenue” stations, a…
or Log In
Sponsored Content
Fast News Search
Sponsored Content