Sponsored Content
South Stream: No Pipelines to Austria
Sponsored Content
Austria will not be connected to the Russian pipeline project. Neither OMV nor Gazprom make a comment.

Initially, OMV and Gazprom signed a joint venture agreement. About 60 kilometers of the pipeline should be built in Austria, the energy group said. Now, Gazprom confirmed that Austria will not be connected to the pipeline.
The Russian pipeline project will ship natural gas from the Russian Black Sea coast to Italy. In total, the pipeline has a length of 2,400 kilometers. In 2015,…
or Log In
Sponsored Content
Sponsored Content
Sponsored Content
Fast News Search
Related News
OMV Underlines Necessity of Shale Gas Production (November 20, 2012)
South Stream Pipeline: Construction Works to Begin in December (November 12, 2012)
OMV: Good Performance Expected (November 6, 2012)
OMV Considers Joining Tanap (September 25, 2012)
Nabucco „Not Essential“ for EU (June 22, 2012)
Sponsored Content
Read More
ISIN
AT0000743059
Featured